With surplus charging, your vehicle is charged primarily with electricity from your own photovoltaic system in order to avoid electricity costs. The principle behind it: if your PV system generates more energy than your household currently needs, exactly this surplus (and only this) is used to charge your electric car.

Specific example:

Your PV system is currently delivering 7.5 kW, while your household consumers need 3.2 kW in total. The currently available surplus is therefore 4.3 kW. With "surplus charging", these 4.3 kW are passed directly to your charging station. If the surplus changes, whether due to fluctuations in production or in consumption, the charging power is adjusted automatically.

Please note: When charging electric vehicles, there are important thresholds and specifics you should know:

  • Most electric cars charge via one or three simultaneously active phases
  • For charging to start, the vehicle needs at least 6 amperes per phase. This corresponds to:
    • For single-phase charging: 6 A × 230 V × 1 phase = at least 1.38 kW
    • For three-phase charging: 6 A × 230 V × 3 phases = at least 4.14 kW
  • For surplus charging, this means that the available surplus must be at least equal to these power values to enable free charging.
  • A particular advantage of the Compleo Solo N+ charging station is its automatic switching between single-phase and three-phase charging. When the surplus power rises above or falls below these thresholds, the Compleo units adapt quickly and easily through their automatic switching.

Requirements for surplus charging

  • Configured BEAAM and active energy management
  • PV system (whose output can exceed the household consumption)
  • Compatible charging station, such as the Compleo Solo N+

Phase switching

Start of a charging session in general:

At the beginning of a charging session, the system checks on how many phases the vehicle can be charged. Vehicles that charge single-phase start with a surplus of at least 1.38 kW (6 A × 230 V).

Thresholds

  • Single-phase charging: Starts at a surplus power of approximately 1,400 W from the PV system.
  • Single-phase charging: Is used up to a surplus power of 4,200 W.
  • From a surplus of 4,200 W, the system switches to three-phase charging.
  • Switching from three-phase to single-phase charging takes place when the surplus power of the PV system falls below 4,140 W (only for charging stations with phase switching, e.g. Compleo Solo N and N+).

This intelligent switching ensures optimal use of the surplus PV power and increases the efficiency of the charging process.

Image 1-Nov-11-2024-08-57-22-7511-AM

Currently, phase switching from single-phase to three-phase charging and vice versa is possible with the neoom Solo N and Solo N+ as well as with the charging stations listed in the current compatibility list.

Important terms in connection with surplus charging

Switching cycle

A switching cycle is either a switch-on or switch-off operation or a change of phases.

Phase change cycles

To protect the vehicle's onboard charger, the number of phase changes during a charging session is limited. Currently, a maximum of 20 phase changes (switching cycles) per charging session is allowed.

Phase change delays

To maintain communication between the charging system and the vehicle, charging is briefly paused during a switchover and then restarted. This process takes about 90 seconds. Pausing the charging session ensures error-free switching.

Average calculation

Since household consumption has a significant influence on the available surplus in addition to the generated PV power, it must always be taken into account. Devices such as cooktops, motors or coffee machines can quickly cause the 20 switching cycles to be reached. For this reason, a moving 5-minute average is calculated. In simple terms, the current surplus is recorded every 5 seconds, and after 5 minutes an average value is calculated from it. If there is no longer sufficient surplus available during these 5 minutes, the required power is drawn either from the grid or from the storage. Charging is then paused or reduced to a lower number of phases.

Results during surplus charging

After the average has been recorded after 5 minutes, one of the following events occurs:

The average results in a nearly constant surplus and prevents the thresholds from being exceeded or undershot.

Charging continues.

The average results in a surplus that is too low.

Charging pauses.

Charging was paused and is resumed as soon as the average exceeds the threshold again.

Charging resumes.

The average adjusts accordingly, so that a switch between single-phase and three-phase charging or vice versa can take place (as already mentioned, only possible with charging stations with phase switching, e.g. Solo N and N+).

Charging is briefly interrupted to perform a phase switch. This is only possible with charging stations with phase switching, e.g. Solo N and N+.

Real-world examples

Time

PV production

Available surplus

Charging status

16:15

6 kW

5 kW (1 kW household consumption)

The car starts three-phase charging

16:17

6 kW

5 kW on average (1 kW household consumption)

The car continues to be charged with 5 kW

16:20

6 kW

3 kW household consumption on average

The car continues to be charged with 5 kW. If energy is missing for surplus charging, it is drawn from the grid or from the storage, depending on the configuration.

16:25

6 kW

3 kW household consumption on average

A phase change delay of 90 seconds occurs. - Compleo Solo N+: The vehicle switches to single-phase charging. - Charging station: Charging is paused.

What information is required to report problems to neoom support

Questions

Possible answer

Charging station

Which charging station (manufacturer + model) is used?

  • Does the charging station support surplus charging and can it be integrated into neoom Ai? neoom Ai device list - The Solo N+ enables switching between single-phase and three-phase charging and offers the option of remote access to the charging station.

Which software is installed on the charging station?

The charging station needs suitable software that supports surplus charging.

Car

Which car(s) are charged at this charging station (make + model)?

How many phases the respective car can therefore be charged with.

Is software installed on the car that supports surplus charging?

The cars need the appropriate software that supports surplus charging.

Charging session

Has surplus charging worked before?

"No": Check installation, configuration, network "Yes": Check the current situation, when it did not work.

When did surplus charging not work from the customer's point of view (date/time)?

Via the "site" you can trace the energy flow remotely.

Was the possible charging session started correctly?

RFID release locally / via backend or via free charging.

Network

Has the BEAAM already been successfully installed and configured?

Check the site in neoom Ai.

Can a permanent network connection be ensured?

For smooth interaction, a permanent connection between inverter, BEAAM and charging station is required.

Configuration

Request the commissioning report incl. log files (for Solo N+).

Check the configuration.

Tips for testing surplus charging

  • Large consumers in the house can be switched on and off
  • Control at the inverter is possible
  • Priorities in neoom Ai can be changed
  • Is the maximum grid connection power set correctly in neoom Ai? (Configure site -> Energy management -> Limit grid connection power to ...)