Basic information on capacity expansion of home storage systems:

For the capacity expansion of home storage systems, in addition to all data sheets you will find all the information needed for planning and implementation in the respective manual in our download area.

Pay particular attention to the chapters on cascading and paralleling the home storage system.

The capacity expansion of the home storage system can be done at any time afterwards. It is recommended within the first 12 months, as the cell chemistry changes over time. Note that the SoH (State of Health) of the new battery module automatically adjusts to the SoH of the already installed battery storage. A capacity increase does not improve or raise the SoH.

Please note that systems can only ever be expanded with identical (the existing) battery modules.

Specifically:

STAAK Can be expanded to up to 7 modules per battery tower

You can also connect up to 6 identical battery towers to one NEEO. With Sofar this is only possible after special approval from neoom, and with Solax and GoodWe it is not permitted.

Please refer to the knowledge base entry:

STAAK Eco Can be expanded to up to 5 modules per battery tower.

You can also connect up to 6 identical battery towers to one NEEO. With Sofar this is only possible after special approval from neoom, and with Solax and GoodWe it is not permitted.

Please refer to the knowledge base entry:

KJUUBE & KJUUBE Light

Depending on the system variant, different BMS types and battery modules are installed

  • Battery module variant 1: H48050 = 2.4 kWh per module
  • Battery module variant 2: H48074 = 3.55 kWh per module
  • SC0500: up to 8 battery modules can be connected (for more modules, replacement with SC1000 is possible)
  • SC1000: up to 14 battery modules can be connected

In addition, for KJUUBE and KJUUBE Light you must check whether further enclosures, called "BatteryKJUUBE", as well as the KJUUBE Battery-Battery cable set, are required.

Steps before the expansion

Charge the existing modules to at least 90% SoC (at least 50% for commercial storage systems) before the expansion is carried out.: [Emergency power reserve settings](../../Energiemanagement%20(neoom%20Ai)/Funktionen/Speicher%20steuern/notstrom-reserve-einstellungen__4819550684.md)

The existing modules are delivered with a state of charge of approx. 90%. To avoid a long , the existing battery modules should be charged to at least 90% before installing the expansion module.

Follow-up question:

To bring the batteries of your existing system to 90%, simply set the emergency power reserve in CONNECT to this value: [Emergency power reserve settings](../../Energiemanagement%20(neoom%20Ai)/Funktionen/Speicher%20steuern/notstrom-reserve-einstellungen__4819550684.md)

After recommissioning, please set the emergency power reserve back to the original value (or the customer's wish).