The NEEO has the following input channels (PV & battery connections), and they must be set as follows.

  • Battery input 1: Battery 1
  • Battery input 2: Battery 1
  • PV Channel1: PV Input 1
  • PV Channel 2: PV Input 2

This also applies to parallelized systems. You can find the input channels under System Settings. To change them, switch the inverter to standby (Switch On/Off).

Connection explanation: Each battery input of the NEEO can be charged and discharged with up to 25 A. Since the neoom STAAK, for example, can reach a charge/discharge current of up to 37 A, both battery inputs are configured to the same battery. For this reason, neoom provides a cable set for every system that uses both connections on the inverter side.

If battery input 2 is set to "Battery 2", the NEEO shows the error message "ID158". Therefore, always make sure that both inputs are set to "1".

For the "PV Channels", the configuration refers to the MPPTs. It does not matter whether anything is actually connected; no error message is shown if nothing is connected.

You can find further explanations and instructions in the neoom manuals in the download area