This article supplements selected chapters of the manual but does not replace it. Read the manual in full, especially regarding the qualifications required as a qualified electrician, hazard warnings and protective equipment. You can find it under "Links" in the table of contents.
Table of contents
Overview
Use: Solax hybrid inverter Communication type: ModBus RTU Phase netting: non-netting Measurement method: current transformer measurement MID certified: no Article number set (meter + CTs): 40620798 Article number meter: not available Article number CT: 40800669




Links
Manuals:
Electrical installation

The arrow on the current transformers must point towards the CUSTOMER (= LOADS).
Communication connection
| Inverter | CHINT |
A+ | 1 | 24 |
B- | 2 | 25 |
GND |

CT ratio | Article number |
200A/5A = 40 | 40800669 |
Configuration
The CT ratio must be set differently for different current transformer clamps. neoom supplies current transformers with a ratio of 200A / 5A = 40
However, you do not have to use the current transformer clamps supplied by neoom. The ratio may therefore differ.
Caution: Do not extend or shorten the cables of the current transformer clamps.

Software/firmware version
The firmware version of the CHINT differs between the CHINT for a Solax and the CHINT for a Sofar
Error code/ troubleshooting
Energy meter transmits unrealistic values | Check whether the reference voltage L1, L2, L3 (power supply for the energy meter) matches the phases measured by the respective current transformer. To do this, switch off the storage system and the PV system and observe the grid consumption of the installation. If unrealistic values are transmitted on different phases, this indicates an incorrect connection. 3-phase busbars are often used during installation, which can easily lead to this error. |
FAQs
How does an incorrectly installed energy meter affect the storage system?
What typical signs indicate that the energy meter was not installed correctly?
What happens if a charging station or an external inverter is installed upstream of the energy meter, and how does this incorrect installation affect CONNECT?