Commercial storage › TERRA

Cascading BLOKK or TERRA (Main/Support Operation)

Updated on 22/11/2026

With Main/Support you can combine a wide variety of C&I storage systems such as BLOKK and TERRA at one connection point and thus reach unimagined dimensions of power and capacity!

You are looking for a storage system for your connection point with a power and/or capacity that exceeds the limit of a single neoom storage system, e.g....

  • BLOKK NN: > 704 kW (8x 88 kW) / 2,387 kWh(24x 99.5 kWh)
  • TERRA: > 750 kW (6x 125 kW) / 6,192 kWh (24x 258 kWh)
  • BLOCK LIGHT NEA: > 120 kW (4x 30 kW) / 398 kWh (4x 99.5kWh)

...then Main/Support is YOUR solution! But how does it actually work?

  • You decide which storage systems you would like to use combined
  • One selected storage system is defined as Main, the boss, so to speak
  • All other storage systems act as Support and follow the boss, so to speak
  • Info: A "storage system" is formed here by a Beckhoff CX controller => for BLOKK up to 8x inverters (704 kW) => for TERRA up to 6x inverters (750kW) => for BLOKK LIGHT NEA up to 4x inverters (120kW)

If, regardless of power/capacity, you want to combine your backup-power-capable storage BLOKK LIGHT NEA with a grid-parallel one (e.g. BLOKK NN or TERRA), Main/Support is also exactly right for you! In combination with a BLOKK (LIGHT NEA), note the following:

  • neoom recommends a maximum of one BLOKK LIGHT NEA in a Main/Support network. Background: If several NEAs are connected to the same connection in backup power mode, the inverters would interfere with each other and therefore could not build up a stable grid.
  • If the external grid fails, all BLOKK NN and/or TERRA must be disconnected from the grid immediately. Important: If a grid is subsequently built up via the BLOKK LIGHT NEA, all BLOKK NN and/or TERRA must remain disconnected!
    • e.g. can be implemented via an interface for external grid and system protection
    • If the grid and system protection opens a main switch due to a grid disturbance/outage, the external grid and system protection is triggered as well
  • If the grid and system protection of a BLOKK LIGHT NEA is defective, BLOKK NN and/or TERRA can still be operated grid-parallel in the same grid (BLOKK NN and/or TERRA are located closer to the grid connection point than the grid and system protection of the NEA)

In addition to the previous points, special requirements also apply to the network:

  • The switches for the Main/Support communication (Phoenix Contact FL 2008) must be connected in a ring via LAN cable
  • LAN ports 1 and 5 of each switch are reserved for this ring.
  • The remaining LAN ports can be used for:
    • Main BLOKK: Secomea SiteManager, BEAAM, CX, smart meter
    • Support BLOKK: CX, smart meter

IMPORTANT for ordering for NEW INSTALLATIONS: The required software is already installed on all devices that are newly delivered. But which additional hardware accessories do I need for an appropriate implementation?

  • BLOKK:
    • 1 x 40820618 Main Kit for Main/Support operation for BLOKK systems, for the BLOKK that is to take on the "boss role" as Main.
    • n x 40820617 Support Kit for Main/Support operation for BLOKK systems, for all other BLOKKs in the storage cluster.
  • BLOKK Light:
    • 1 x 40820618 Main Kit for Main/Support operation for BLOKK systems, for the BLOKK Light that is to take on the "boss role" as Main.
    • n x 40820617 Support Kit for Main/Support operation for BLOKK Light systems, for all other BLOKK Light in the storage cluster.
  • BLOKK LIGHT NEA:
    • 1 x 40820619 Main Kit for Main/Support operation for BLOKK Light NEA systems, for the BLOKK Light NEA that is to take on the "boss role" as Main.
  • - n x 40820617 Support Kit for Main/Support operation for BLOKK systems, for all other BLOKK LIGHT NEA in the storage cluster.
  • TERRA
    • 1 x 40850052 TERRA EMS (Main System) for the TERRA system that is to take on the "boss role" as Main.
    • n x 40850053 TERRA EMS (Support System) for all other TERRA systems in the storage cluster.

Note: All listed items can be selected directly in the Partner Portal as follow-up parts to the storage systems.

IMPORTANT for UPGRADING EXISTING SYSTEMS IN THE FIELD: **neoom must first check which software and hardware version the existing system has. Unfortunately, compatibility for Main/Support operation is not fully possible for all systems.

However, it is usually technically possible to establish this compatibility. neoom will gladly support you in finding a solution.

For most existing BLOKK systems, the following retrofit option with predefined upgrade kits generally applies:**

  • BLOKK:(valid for the product generations BLOKK V2.1)
    • 1 x 40820622 Retrofit Main Kit for Main/Support operation for existing BLOKK systems, should this BLOKK take on the "boss role" as Main in the future Main/Support cluster.
    • n x 40820623 Retrofit Support Kit for Main/Support operation for existing BLOKK systems, to establish compatibility for participation in the storage cluster.
  • BLOKK Light: (valid for the product generations BLOKK Light V2.1)
    • 1 x 40820622 Retrofit Main Kit for Main/Support operation for existing BLOKK Light systems, should this BLOKK Light take on the "boss role" as Main in the future Main/Support cluster.
    • n x 40820623 Retrofit Support Kit for Main/Support operation for existing BLOKK Light systems, to establish compatibility for participation in the storage cluster.
  • BLOKK LIGHT NEA: (valid for the product generations BLOKK Light NEA V2.2 or V3.1/V3.2)
    • 1 x 40820624 Retrofit Main Kit for Main/Support operation for existing BLOKK Light NEA systems, should this BLOKK Light NEA take on the "boss role" as Main in the future Main/Support cluster.
  • - n x 40820623 Retrofit Support Kit for Main/Support operation for existing BLOKK LIGHT NEA systems, to establish compatibility for participation in the storage cluster.
  • TERRA
    • TERRA systems are always delivered from the factory with the TERRA EMS Main or Support, so they are automatically able to participate in a Main/Support system.

Note: All listed items can be selected in the Partner Portal as accessories. The conversion is carried out on site by neoom technicians, and any travel costs and expenses incurred are charged according to effort. Additional installation material is clarified in advance depending on the system, and neoom reserves the right to charge for it according to effort. Optionally, the existing circuit diagrams can be revised; this effort is also charged according to effort.