neoom Ai can dynamically reduce the output of the inverters based on a ripple control signal sent by the grid operator. To do this, you simply connect the ripple control receiver provided by the grid operator to the BEAAM Extension. The 4 different power limits (% values) can be set directly in neoom Ai according to the grid operator's requirements. As soon as a site is affected by a temporary feed-in limitation signaled by the ripple control signal, you also receive a notification directly in the neoom App. The feature is included in Free.
The ripple control signal based power limitation of grid feed-in is not to be confused with a maximum feed-in limit imposed on a site by the grid operator. To set a maximum feed-in limit that is independent of the ripple control signal, neither a BEAAM Extension nor the "Ripple Control" function in CONNECT is required. If the received ripple control signal indicates 100%, then 100% is the configured maximum feed-in power.
Required components
- neoom BEEAM + 12V power supply (Not included in the delivery, but can be ordered through neoom)
- neoom BEAAM Extension
- - Power supply for BEAAM Extension (9-30V/4W) (not included in the delivery)
- - Ripple control receiver (provided by the grid operator)
Supported inverters
neoom Ai supports power limitation via the ripple control receiver signal for the following systems and inverters:
- KJUUBE with Sofar or Solax inverter
- STAAK with Sofar or Solax inverter
- NEEO inverter
- Fronius PV inverter (see www.neoom.com/neoom-ai-geraete for the supported models)
- Huawei PV inverter (see www.neoom.com/neoom-ai-geraete for the supported models)
With the NEEO, both options are possible: The ripple control receiver can be connected directly to the inverter, or the curtailment can be implemented via the BEAAM Extension. The BEAAM Extension regulates the power at the grid connection point, which allows for more self-consumption.
Wiring the ripple control receiver
As a rule, the contact for 100% on the ripple control receiver is not wired, since the system is ramped up to 100% anyway when no reduction contact is active anymore. However, confirm this with your energy supplier/grid operator before installation.
Pin assignment on port J6 of the BEAAM Extension, which is required for this use:
Pin | Label | Description |
5 | i5 | Digital input 5 |
6 | i6 | Digital input 6 |
7 | i7 | Digital input 7 |
8 | i8 | Digital input 8 |
9 | G | Ground for digital inputs |

As soon as one of the digital inputs is activated, the corresponding LED on the BEAAM Extension also lights up.
Wiring the ripple control receiver to the BEAAM Extension
Carry out the wiring according to the following diagram:

*Note: The steps (e.g. 100%, 60%, 30%, 0%) may differ depending on the energy supplier and must therefore be configured correctly in neoom Ai.
For safety, we limit the feed-in power to 0% if the connection to the BEAAM Extension is interrupted (offline) or if multiple signals are received at the same time.
Integrating the BEAAM Extension into the IP network of the customer site
Please see Integrating an SG-Ready heat pump, chapter "Integrating the BEAAM Extension into the IP network of the customer site"
Configuring the ripple control receiver in neoom Ai
After the BEAAM adapter has been successfully added in the neoom web interface of your site, you can configure the ripple control receiver:
- In the "Energy management" tab in the site configuration of your neoom site, you can add the ripple control receiver under "Feed-in limitation". To do this, select the BEAAM Extension from the dropdown in the "Extension" field.
- Finally, you need to enter the maximum permitted feed-in power in kW in the "Max. power" field. Determine the power levels specified by the grid operator. Please enter the power limits in descending order from left to right.

The 100% power level (= no limitation) is set by neoom Ai by default. The remaining 3 power limits must be set as prescribed by the respective grid operator.
Display when a ripple control signal is active
If the grid operator sends a ripple control signal for temporary feed-in power reduction and neoom Ai regulates the feed-in limitation accordingly, the following information is shown in the UI:
Display at <https://connect.neoom.com>:

Display in the neoom App - Live view:

Frequently asked questions (FAQs)
Which PINs are switched for which power limitation specifications from the grid operator?
100% - PIN_DI_i5 input on, other PINs off 60% - PIN_DI_i6 input on, other PINs off 30% - PIN_DI_i7 input on, other PINs off 0% - PIN_DI_i8 input on, other PINs off
What happens if the BEAAM Extension receives invalid specifications from the ripple control signal receiver (e.g. 2 PIN inputs ON at the same time)?
neoom Ai sets the feed-in power to 0% and the following message is shown in the user interface (NAVI):

How does the inverter react to a power limitation specification?
If the feed-in limitation specification changes from 100% to 60%, for example, the inverter reduces its output to the value needed to feed a maximum of 60% of the maximum feed-in power into the grid. If self-consumption decreases, neoom Ai reduces the power value at the inverter further so as not to exceed the feed-in limitation specification (60% in the example). If self-consumption increases, neoom Ai slowly ramps the inverter back up (in 10% steps per minute) to make optimal use of the specified feed-in limit (60% in the example).
If 2 inverters are installed at the site and controlled via the BEAAM Extension for power limitation, neoom Ai regulates one inverter to the value needed to feed a maximum of 60% of the maximum feed-in power into the grid, and the other to 0 (if the output of the first inverter is sufficient to make optimal use of the feed-in limitation specification). If self-consumption increases, neoom Ai slowly ramps the inverters up (in 10% steps per minute) to make effective use of the maximum feed-in limit.
Does the Ripple Control power limitation via neoom Ai also work if several inverters are installed at the site?
Ripple Control currently works with KJUUBE and STAAK storage systems with Sofar or Solax inverters, as well as with NEEO inverters. Master-slave configurations are currently not supported.
An additional PV inverter from Fronius or Huawei can also be installed at the site. This inverter is also regulated by neoom Ai based on the ripple control signal.
Does the feed-in limitation remain in effect if the BEAAM is unreachable or offline?
YES
What happens if the BEAAM loses the connection to the BEAAM Extension?
neoom Ai sets the feed-in power to 0%